Structure
- Slabs and footings
- Columns and beams
- Walls
- Stairs
Quantities pulled from IFC and Revit models, checked against the drawings and then priced
A model carries quantities, but only as good as the modelling. Walls modelled as single elements, missing finishes and untagged items all need an estimator to interpret.
We take the quantities out of the model, compare them with the 2D drawings, measure by hand anything missing and send back a priced estimate along with a list of problems found in the model.
| Deliverable | Format | Detail level |
|---|---|---|
| Model quantities | Excel | By element type and level |
| Cross-check report | Model versus drawings | |
| Priced estimate | Excel + PDF | ASMM / ANZSMM sections |
| Model issues | Feedback for the design team | |
| Revisions | Excel | Model update pricing |
Five steps from your drawings to a BIM number you can defend in a scope review.
An estimator reads the architectural and engineering drawings and specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: metric quantities. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small projects.
Typical fee A$350 to A$850
Mid-size projects.
Typical fee A$850 to A$1,800
Large developments.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A BIM takeoff from us is a per-project cost that only appears when you are actually tendering.
Model-based tender estimates.
Cost plans.
Design-stage costs.
Model checks.
Structural quantities.
Budget tracking.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Slabs | m³ | 620 | $ | $ | $ |
| Walls | m² | 3,100 | $ | $ | $ |
| Doors | No. | 120 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
IFC and Revit.
No. We always compare the model with the 2D drawings.
Yes.
Yes.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.