Controllers
- DDC controllers
- Field panels
- Network switches
- Power supplies
Controllers, sensors, field devices and graphics counted by point
A BMS is priced by the point: each sensor, actuator and status input carries hardware, cabling, programming and commissioning. The point schedule is the whole estimate, and it is usually buried in the mechanical specification.
We build the points list from the drawings and schedules, add controllers, networking, graphics and commissioning, and return a priced controls package matched to Controls and Special Services in the NPWC.
| Deliverable | Format | Detail level |
|---|---|---|
| Points schedule | Excel, No. | By type: AI, AO, DI, DO |
| Controllers and panels | Excel, No. | DDC controllers and field panels |
| Sensors and actuators | Excel, No. | Temperature, pressure, CO2 and valves |
| Cabling and networking | Excel, m | Control cable and network cabling |
| Programming and graphics | Excel, hrs | Software and graphic pages |
| Commissioning | Excel, hrs | Testing and handover |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Building Management Systems (BMS) | 25 CE Controls / Special Services |
Every point in the building.
Five steps from your drawings to a building management systems number you can defend in a scope review.
An estimator reads the controls drawings, input and output schedule, BMS specification and the mechanical and electrical schedules before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: numbers of points by type, controllers and panels, and lineal metres of control cabling. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small commercial buildings.
Typical fee A$350 to A$850
Offices and mid-size buildings.
Typical fee A$850 to A$1,800
Hospitals and large campuses.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A building management systems takeoff from us is a per-project cost that only appears when you are actually tendering.
Point-based takeoffs.
Controls allowances.
BMS package pricing.
Cost feedback.
Cost plans.
Upgrade budgets.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Analog inputs | No. | 240 | $ | $ | $ |
| Digital outputs | No. | 120 | $ | $ | $ |
| DDC controllers | No. | 12 | $ | $ | $ |
| Control cable | m | 6,400 | $ | $ | $ |
| Graphics pages | No. | 40 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
By point, with allowances for controllers, networking, graphics and commissioning.
Yes, and we build one from the drawings if there is none.
Yes, including lighting, metering and access.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.