Strip-out
- Ceiling and wall linings
- Floor coverings
- Joinery and fixtures
- Services removal
Strip-out, demolition and alterations measured in m², m³ and tonnes, with disposal priced
Demolition is priced by what comes out, what stays and where it goes. Hazardous materials, structural propping, service disconnections and disposal volumes decide the cost, and an incomplete hazardous materials register can change the answer completely.
We measure every element to be removed, separate recyclable and landfill material, price asbestos and hazardous work against the register, and return a complete demolition and alterations estimate.
| Deliverable | Format | Detail level |
|---|---|---|
| Strip-out | Excel, m² | Linings, ceilings, floors and fixtures |
| Structural demolition | Excel, m³ | Slabs, walls and frames |
| Hazardous materials | Excel, m² / m | Asbestos, lead paint, synthetic mineral fibre |
| Service disconnections | Excel, No. | Electrical, hydraulic, gas and communications |
| Propping and protection | Excel, m / No. | Temporary structure and dust control |
| Disposal | Excel, t / m³ | Bins, haulage, tip fees and recycling |
| Priced estimate | Excel + PDF | Labour, plant, disposal and GST shown separately |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Demolition / Site Clearance | 37 XR Demolitions / Alterations |
Everything that comes out of the building and off the site.
Five steps from your drawings to a demolition number you can defend in a scope review.
An estimator reads the demolition drawings, hazardous materials register, site survey and the demolition specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of strip-out, cubic metres of demolition, tonnes of disposal and counts of services disconnections. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Single dwellings and small strip-outs.
Typical fee A$350 to A$850
Commercial strip-outs and low-rise demolition.
Typical fee A$850 to A$1,800
Major demolition and site clearance.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A demolition takeoff from us is a per-project cost that only appears when you are actually tendering.
Quantity and disposal takeoffs.
Register-based pricing.
Strip-out allowances.
Site clearance budgets.
Renovation budgets.
37 XR element costs.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Strip-out, ceiling and wall linings | m² | 2,400.0 | $ | $ | $ |
| Demolish concrete slab, 150 mm | m² | 620.0 | $ | $ | $ |
| Asbestos sheet removal | m² | 180.0 | $ | $ | $ |
| Disposal, general waste | t | 86.0 | $ | $ | $ |
| Disconnect services | No. | 14 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, from the hazardous materials register. Without a register we show an allowance and flag the risk.
Yes, because the cost per tonne is different.
Yes, including making good and temporary support.
Yes, with stated assumptions and a list of site-verification items.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.