Walls
- Single and double-layer partitions
- Fire-rated and acoustic walls
- Wet-area sheet and cement sheet
- Bulkheads and box-outs
Wall and ceiling linings, steel framing and finishing measured in m² and lineal metres
Plasterboard is measured by area, but the price depends on board type, number of layers, fire and acoustic ratings, stud centres, ceiling heights and level of finish.
We measure walls and ceilings from the plans and reflected ceiling plans, keep each wall type and rating apart, and give you quantities for board, framing, insulation and labour.
| Deliverable | Format | Detail level |
|---|---|---|
| Wall linings | Excel, m² | Sorted by board type, number of layers and wall type |
| Ceiling linings | Excel, m² | By ceiling type and height |
| Steel and timber framing | Excel, m | Studs, tracks, furring channels and noggings |
| Cornice and set | Excel, m / m² | By level of finish |
| Insulation | Excel, m² | Acoustic and thermal batts |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Plastering / Tiling / Floor Covering / Painting | 12 WF Wall Finishes |
| Plastering / Tiling / Floor Covering / Painting | 14 CF Ceiling Finishes |
Every wall type and ceiling in the building.
Five steps from your drawings to a plasterboard and plastering number you can defend in a scope review.
An estimator reads the architectural plans, reflected ceiling plans, wall types and fire and acoustic specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of lining by board type, lineal metres of framing, cornice and set, and numbers of access panels. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Single houses and renovations.
Typical fee A$350 to A$850
Offices, retail and apartment fit-outs.
Typical fee A$850 to A$1,800
Hospitals, schools and large developments.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A plasterboard and plastering takeoff from us is a per-project cost that only appears when you are actually tendering.
m² and framing takeoffs.
Subcontract checks.
Partition packages.
Board and framing lists.
Per-unit lining costs.
Internal walls element costs.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| 13 mm standard plasterboard for walls | m² | 1,240.0 | $ | $ | $ |
| 16 mm fire-rated board | m² | 320.0 | $ | $ | $ |
| Ceiling lining, 10 mm | m² | 480.0 | $ | $ | $ |
| Steel studs, 64 mm | m | 2,420 | $ | $ | $ |
| Cornice, 90 mm | m | 620 | $ | $ | $ |
| Acoustic batts | m² | 640.0 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, by FRL and wall type.
Yes, from Level 3 to Level 5.
Yes, including grid and tiles.
Yes, steel or timber.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.