ASMM / ANZSMM · Plastering · NPWC 12 WF / 14 CF

Plasterboard & Plastering Estimating

Wall and ceiling linings, steel framing and finishing measured in m² and lineal metres

Plasterboard is measured by area, but the price depends on board type, number of layers, fire and acoustic ratings, stud centres, ceiling heights and level of finish.

We measure walls and ceilings from the plans and reflected ceiling plans, keep each wall type and rating apart, and give you quantities for board, framing, insulation and labour.

Plasterboard wall linings being fixed
24 to 48 hoursStandard scope turnaround
m² by lining typeWalls and ceilings
Fire & acousticFRL walls separated
Levels of finishLevel 3 to 5
FramingSteel and timber
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Wall liningsExcel, m²Sorted by board type, number of layers and wall type
Ceiling liningsExcel, m²By ceiling type and height
Steel and timber framingExcel, mStuds, tracks, furring channels and noggings
Cornice and setExcel, m / m²By level of finish
InsulationExcel, m²Acoustic and thermal batts
Priced estimateExcel + PDFSupply and installation, with GST on its own line
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Plastering / Tiling / Floor Covering / Painting12 WF Wall Finishes
Plastering / Tiling / Floor Covering / Painting14 CF Ceiling Finishes
Scope Coverage

Plasterboard Work We Measure

Every wall type and ceiling in the building.

Walls

  • Single and double-layer partitions
  • Fire-rated and acoustic walls
  • Wet-area sheet and cement sheet
  • Bulkheads and box-outs

Ceilings

  • Suspended grid and plasterboard
  • Direct-fix ceilings
  • Bulkheads and shadowlines
  • Access panels

Framing

  • Steel stud framing
  • Furring and ceiling channels
  • Timber noggings
  • Door and window framing

Finishing

  • Cornice and plaster set
  • Level 4 and 5 finishes
  • Corner beads and trims
  • Render and solid plaster

Acoustic & fire

  • Acoustic insulation
  • Fire collars and sealants
  • Fire-rated linings
  • Sound-rated ceilings
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a plasterboard and plastering number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the architectural plans, reflected ceiling plans, wall types and fire and acoustic specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of lining by board type, lineal metres of framing, cornice and set, and numbers of access panels. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Single houses and renovations.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Offices, retail and apartment fit-outs.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Hospitals, schools and large developments.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Plasterboard & Plastering Estimating to Us

A full-time estimator is a salary, super, software seats and training. A plasterboard and plastering takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar plasterboard and plastering scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Plasterboard

Plasterers and fixers

m² and framing takeoffs.

Builders

Subcontract checks.

Fit-out contractors

Partition packages.

Suppliers

Board and framing lists.

Developers

Per-unit lining costs.

Quantity surveyors

Internal walls element costs.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
13 mm standard plasterboard for wallsm²1,240.0$$$
16 mm fire-rated boardm²320.0$$$
Ceiling lining, 10 mmm²480.0$$$
Steel studs, 64 mmm2,420$$$
Cornice, 90 mmm620$$$
Acoustic battsm²640.0$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

Do you list fire-rated walls separately?

Yes, by FRL and wall type.

Do you price levels of finish?

Yes, from Level 3 to Level 5.

Can you cover suspended ceilings?

Yes, including grid and tiles.

Do you include framing?

Yes, steel or timber.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Plasterboard & Plastering Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑