Lighting
- Light fittings by type
- Emergency and exit lighting
- Lighting controls and sensors
- External and feature lighting
Light and power takeoffs in metres and numbers, to AS/NZS 3000
Electrical estimates are counts and lengths: light fittings, outlets, circuits, containment and cable. The detail is in the switchboards, the cable sizing and the testing and compliance work that follows.
We take off the full electrical scope from the layouts and schedules, count every point, measure cable and containment, and return a priced schedule matched to Light and Power in the ASMM and 23 LP in the NPWC.
| Deliverable | Format | Detail level |
|---|---|---|
| Lighting | Excel, No. | By fitting type and control |
| Power outlets and switches | Excel, No. | Power points, data points, isolators and switches |
| Cabling | Excel, m | By size, type and circuit |
| Containment | Excel, m | Conduit, tray, trunking and ladder |
| Switchboards | Excel, No. | Main and sub boards by component |
| Testing and commissioning | Excel, hrs | Testing and tagging allowances |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Electrical Services / Light & Power | 23 LP Light and Power |
Every circuit from the main switchboard to the last light.
Five steps from your drawings to a electrical services number you can defend in a scope review.
An estimator reads the electrical drawings, lighting layouts, switchboard schedules and the electrical specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of cable and conduit, counts of light fittings, outlets and switches, and numbers of switchboard components. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Houses and small commercial buildings.
Typical fee A$350 to A$850
Offices, retail and clinics.
Typical fee A$850 to A$1,800
Hospitals, industrial and large developments.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A electrical services takeoff from us is a per-project cost that only appears when you are actually tendering.
Point and cable takeoffs.
Services allowances.
Electrical cost plans.
Fitting and cable lists.
Cost feedback.
PV and battery scopes.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| LED downlights | No. | 186 | $ | $ | $ |
| Double GPOs | No. | 142 | $ | $ | $ |
| 2.5 mm² TPS cable | m | 4,860 | $ | $ | $ |
| Cable tray, 300 mm | m | 320.0 | $ | $ | $ |
| Main switchboard | No. | 1 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
We measure what the documents show, which are designed to the Wiring Rules.
Yes, from the light schedule.
Yes.
Yes, as a separate line.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.