ASMM / ANZSMM · Fire Services · NPWC 24 FI

Fire Services Estimating

Sprinklers, hydrants, hose reels, detection and alarm measured in metres and numbers

Fire services are priced by heads, detectors, pipe length and pumps, and each system is designed to its own standard: AS 2118 for sprinklers, AS 2419 for hydrants, AS 1670 for detection and alarms. Missing a zone, a pump or a tank changes the price by thousands.

We take off the full fire services scope from the drawings, covering sprinklers, hydrants, hose reels, detection, alarm and emergency warning, and return a priced schedule by system.

Fire services installation
24 to 48 hoursStandard scope turnaround
AS 2118Sprinkler systems
AS 2419Fire hydrants
AS 1670Detection and alarm
By systemZones, heads and pumps
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Sprinkler pipework and headsExcel, m / No.By zone, diameter and head type
Hydrants and hose reelsExcel, No. / mPipework, valves and cabinets
Fire pumps and tanksExcel, No.Diesel and electric pumps, break tanks
Detection and alarmExcel, No.Detectors, call points, sounders and panels
Emergency lighting and EWISExcel, No.Exit signs, lights and speakers
Extinguishers and blanketsExcel, No.By type and location
Priced estimateExcel + PDFSupply and installation, with GST on its own line
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Fire Services / Sprinkler Systems24 FI Fire Services
Scope Coverage

Fire Services Work We Measure

Active fire systems from pump to head.

Sprinklers

  • Mains and risers
  • Branch pipework and heads
  • Alarm valves and flow switches
  • Sprinkler pumps

Hydrants & hose reels

  • Ring main and hydrants
  • Booster assemblies
  • Hose reels
  • Landing valves

Detection & alarm

  • Smoke and heat detectors
  • Fire indicator panels
  • Sounders and strobes
  • Monitoring

Emergency systems

  • Exit and emergency lighting
  • EWIS and speakers
  • Smoke control
  • Gas suppression

Testing & handover

  • Hydrostatic testing
  • Commissioning
  • Certification
  • Maintenance first year
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a fire services number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the fire services drawings, hydraulic layouts, detection layouts and the fire engineering report before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of fire pipework by diameter, numbers of heads, detectors and hydrants, and tanks and pumps. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Small commercial buildings.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Offices, retail and apartments.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

High-rise and industrial fire systems.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Fire Services Estimating to Us

A full-time estimator is a salary, super, software seats and training. A fire services takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar fire services scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Fire Services

Fire contractors

Head, pipe and detector takeoffs.

Builders

Fire services allowances.

Hydraulic contractors

Combined hydraulic and fire packages.

Fire engineers

Cost feedback.

Developers

Cost plans.

Facility managers

Upgrade budgets.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
Sprinkler heads, pendantNo.420$$$
Sprinkler pipework, DN50m860.0$$$
Fire hydrantsNo.6$$$
Smoke detectorsNo.180$$$
Fire pump setNo.1$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

Do you cover sprinklers and hydrants?

Yes, both, plus detection, alarm, hose reels and emergency systems.

Do you work from the fire engineering report?

Yes, where one is provided.

Do you cover passive protection?

Passive fire is on its own page; we can combine them.

Do you include testing and certification?

Yes, as separate lines.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Fire Services Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑