Tiling
- Floor tiles and wall tiles
- Feature and mosaic tile
- Waterproofing links
- Grout and silicone
Floor and wall tiling, carpet, vinyl and timber measured in m² with wastage shown
Floor finishes are measured by area but priced by material, pattern, substrate preparation and waterproofing. Tile layouts, borders, level changes and transitions all add cost that a flat m² rate ignores.
We measure each room from the finishes plan, separate each material and substrate prep, and return a schedule with wastage, adhesives, trims and labour.
| Deliverable | Format | Detail level |
|---|---|---|
| Floor finishes | Excel, m² | By material, room and substrate |
| Wall tiling | Excel, m² | Wet areas, splashbacks and feature walls |
| Skirtings and trims | Excel, m | Timber, tile and vinyl skirtings; edge trims |
| Substrate preparation | Excel, m² | Grinding, levelling and primers |
| Adhesives and grout | Excel, kg / bags | By tile size and area |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Plastering / Tiling / Floor Covering / Painting | 13 FF Floor Finishes |
Every surface people walk on.
Five steps from your drawings to a tiling and floor coverings number you can defend in a scope review.
An estimator reads the floor finishes plan, finishes schedule, tile layouts and the floor covering specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of floor and wall finish by material, lineal metres of skirting, trims and thresholds. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Single houses and renovations.
Typical fee A$350 to A$850
Offices, retail and apartments.
Typical fee A$850 to A$1,800
Hospitals, schools and developments.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A tiling and floor coverings takeoff from us is a per-project cost that only appears when you are actually tendering.
m² and trim takeoffs.
Allowances and subcontract checks.
Finish packages.
Material counts.
Per-unit finish costs.
Cost feedback.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| 600 x 600 porcelain floor tiles | m² | 212.0 | $ | $ | $ |
| Wall tiles, bathrooms | m² | 168.0 | $ | $ | $ |
| Carpet tiles | m² | 320.0 | $ | $ | $ |
| Timber skirting | m | 420 | $ | $ | $ |
| Floor preparation and levelling | m² | 212.0 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, we state an allowance that depends on the layout and tile size.
Yes, by m² and grind level.
We link it to the waterproofing scope.
Yes, sorted by room, level and material.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.