ASMM / ANZSMM · Carpentry & Timber Framing

Timber Framing Estimating

Wall, floor and roof framing quantified in lineal metres, m² and m³, in 24 to 48 hours

Framing is where a house is won or lost on a spreadsheet: stud lengths, nogging, lintels and bracing add up fast, and a handful of undersized allowances can wipe out a margin.

We build the framing takeoff wall by wall, floor by floor and roof by roof, in lineal metres by section, then add connectors, bracing, wastage and labour so your price covers the real job.

Timber wall and roof framing
24 to 48 hoursStandard scope turnaround
Lineal metresBy section and grade
AS 1684Residential timber framing
Trusses countedAnd connectors scheduled
Steel & timberLight-gauge steel too
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Wall framingExcel, mPlates, studs, noggings and lintels, listed by section
Floor framingExcel, mBearers, joists and flooring sheet area
Roof framingExcel, m / No.Rafters, battens and trusses, counted by type
Bracing and connectorsExcel, No.Sheet bracing, straps, tie-downs and framing anchors
Engineered timberExcel, mLVL, glulam and I-joists, listed by size
Labour hoursExcel, hrsBy stage: wall, floor, roof
Priced estimateExcel + PDFSupply and installation, with GST on its own line
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Carpentry & Joinery: Timber Framing15 FT Fitments / Timber Framing
Scope Coverage

Framing Work We Measure

From bearers to ridge, in metric.

Floor systems

  • Bearers and joists
  • Particleboard and structural ply flooring
  • Engineered joists
  • Subfloor ventilation

Wall framing

  • Studs, plates and noggings
  • Lintels and framing for doors and windows
  • Bracing walls
  • Steel stud framing

Roof framing

  • Pre-fabricated trusses
  • Rafters, hips and valleys
  • Roof battens
  • Fascia and eaves framing

Connectors

  • Tie-downs and hold-down bolts
  • Joist hangers and brackets
  • Structural screws and nails
  • Wind-rated connections

Engineered timber

  • LVL and glulam beams
  • Posts and portals
  • Decking and pergola frames
  • Stair carriages
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a timber framing number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the architectural plans, structural framing details, truss layouts and the AS 1684 span and bracing requirements before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of framing by section, square metres of sheet bracing and counts of trusses and connectors. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Single dwellings, extensions and granny flats.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Townhouses, duplexes and small commercial.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Multi-dwelling and mid-rise timber frame projects.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Timber Framing Estimating to Us

A full-time estimator is a salary, super, software seats and training. A timber framing takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar timber framing scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Framing

Carpenters and framers

Lineal metre takeoffs with labour.

Volume builders

Per-plan packages.

Truss and frame fabricators

Counts for quoting.

Renovators

Extension and alteration framing.

Timber suppliers

Material list confirmation.

Quantity surveyors

Frame element costs.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
90 x 45 MGP10 studsm3,420$$$
90 x 45 top and bottom platesm1,180$$$
Noggings, 90 x 45m1,040$$$
Roof trusses, 5 to 12 m spanNo.34$$$
Sheet bracing, 9 mm plym²62.0$$$
Tie-down rods and bracketsNo.220$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

How do you measure framing?

In lineal metres by section and grade, wall by wall, with lintels, noggings and bracing separated.

Do you work to AS 1684?

We follow the sizes and bracing shown on your drawings and engineering, which typically reference AS 1684.

Can you count trusses?

Yes, by type, span and number, using the truss layout when it is provided.

Do you include wastage?

Yes, as a visible allowance you can change.

Do you cover steel framing?

Yes, including light-gauge steel studs, tracks and joists.

Can you give a materials-only list?

Yes, a supplier-ready list with sizes and lengths.

What does it cost?

A fee is quoted per project in AUD excluding GST before work starts.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours.

Ready to Get Started?

Ready for Your Next Timber Framing Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑