ASMM / ANZSMM · Mechanical Services

Mechanical Services Estimating

Plant rooms, pipework, ductwork and equipment quantified in 24 to 48 hours

Mechanical packages mix plant, pipework, ductwork and controls, and the plant room is usually where the budget hides. Equipment weights, crane lifts, supports and access all matter.

We cover the whole mechanical scope from the drawings and equipment schedules, including plant rooms and hydronic systems, and return a priced schedule.

Mechanical services plant and ductwork
24 to 48 hoursStandard scope turnaround
Plant roomsEquipment and pipework
HydronicChilled and hot water
Metricm, m², kg and tonnes
ControlsLinked to BMS
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Plant and equipmentExcel, No.By model, capacity and weight
PipeworkExcel, mBy diameter, material and insulation
DuctworkExcel, m²By type and size
Supports and structureExcel, No. / kgHangers, frames and plinths
Crane and riggingExcel, daysFor plant lifts
Priced estimateExcel + PDFSupply and installation, with GST on its own line
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Mechanical Services / Air Conditioning21 AC Air Conditioning
Mechanical Services / Air Conditioning22 VE Ventilation
Scope Coverage

Mechanical Work We Measure

Plant room to terminal unit.

Plant rooms

  • Chillers, boilers and pumps
  • Air handling units
  • Cooling towers
  • Plinths and supports

Hydronic systems

  • Chilled and hot water pipework
  • Valves and meters
  • Expansion tanks
  • Insulation

Air systems

  • Supply, return and exhaust duct
  • Fans and silencers
  • Terminal units
  • Fire dampers

Controls

  • Sensors and actuators
  • Control panels
  • BMS integration
  • Commissioning

Specialist

  • Kitchen exhaust
  • Cool rooms
  • Clean rooms
  • Process cooling
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a mechanical services number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the mechanical drawings, plant room layouts, equipment schedules and the specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of pipe, square metres of duct, tonnes of equipment and numbers of fittings. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Small commercial buildings.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Offices and clinics.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Hospitals and industrial facilities.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Mechanical Services Estimating to Us

A full-time estimator is a salary, super, software seats and training. A mechanical services takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar mechanical services scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Mechanical Services

Mechanical contractors

Package takeoffs.

Builders

Services allowances.

Developers

Mechanical cost plans.

Engineers

Cost feedback.

Facilities managers

Upgrade budgets.

Suppliers

Equipment lists.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
Chiller, 400 kWNo.2$$$
Chilled water pipe, DN100m280.0$$$
Pumps, duty and standbyNo.4$$$
Duct, rectangularm²620.0$$$
Mobile crane, plant liftday2$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

How is this different from the air conditioning page?

This covers the complete mechanical package including plant rooms and hydronics; the air conditioning page covers distribution and terminal equipment in more detail.

Do you include crane lifts?

Yes, as a separate line.

Do you cover BMS?

Yes, we link to the BMS scope.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Mechanical Services Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑