Plant rooms
- Chillers, boilers and pumps
- Air handling units
- Cooling towers
- Plinths and supports
Plant rooms, pipework, ductwork and equipment quantified in 24 to 48 hours
Mechanical packages mix plant, pipework, ductwork and controls, and the plant room is usually where the budget hides. Equipment weights, crane lifts, supports and access all matter.
We cover the whole mechanical scope from the drawings and equipment schedules, including plant rooms and hydronic systems, and return a priced schedule.
| Deliverable | Format | Detail level |
|---|---|---|
| Plant and equipment | Excel, No. | By model, capacity and weight |
| Pipework | Excel, m | By diameter, material and insulation |
| Ductwork | Excel, m² | By type and size |
| Supports and structure | Excel, No. / kg | Hangers, frames and plinths |
| Crane and rigging | Excel, days | For plant lifts |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Mechanical Services / Air Conditioning | 21 AC Air Conditioning |
| Mechanical Services / Air Conditioning | 22 VE Ventilation |
Plant room to terminal unit.
Five steps from your drawings to a mechanical services number you can defend in a scope review.
An estimator reads the mechanical drawings, plant room layouts, equipment schedules and the specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of pipe, square metres of duct, tonnes of equipment and numbers of fittings. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small commercial buildings.
Typical fee A$350 to A$850
Offices and clinics.
Typical fee A$850 to A$1,800
Hospitals and industrial facilities.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A mechanical services takeoff from us is a per-project cost that only appears when you are actually tendering.
Package takeoffs.
Services allowances.
Mechanical cost plans.
Cost feedback.
Upgrade budgets.
Equipment lists.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Chiller, 400 kW | No. | 2 | $ | $ | $ |
| Chilled water pipe, DN100 | m | 280.0 | $ | $ | $ |
| Pumps, duty and standby | No. | 4 | $ | $ | $ |
| Duct, rectangular | m² | 620.0 | $ | $ | $ |
| Mobile crane, plant lift | day | 2 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
This covers the complete mechanical package including plant rooms and hydronics; the air conditioning page covers distribution and terminal equipment in more detail.
Yes, as a separate line.
Yes, we link to the BMS scope.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.