Windows
- Aluminium, timber and uPVC windows
- Double glazing and low-E
- Awning, sliding and fixed units
- Bushfire-rated windows
Window, door and hardware schedules counted by type and size, and glass measured in m²
Windows and doors are priced by the unit, but the schedule rarely tells the whole story: frame colour, glass type, energy rating, fire rating, security and hardware all change the price.
We build the schedule from the plans and elevations, check it against the supplier schedule, and return a priced list in the order the supplier will want to quote.
| Deliverable | Format | Detail level |
|---|---|---|
| Window schedule | Excel, No. | By type, size, frame and glass |
| Door schedule | Excel, No. | External and internal doors, with fire ratings |
| Glass | Excel, m² | Toughened, laminated, low-E and double glazed |
| Hardware sets | Excel, No. | Locks, closers, hinges and panic hardware |
| Glazed screens and shopfronts | Excel, m² | Frames and glass |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Windows / Glazing / Doors & Hardware | 07 WW Windows |
| Windows / Glazing / Doors & Hardware | 08 ED External Doors |
| Windows / Glazing / Doors & Hardware | 11 ND Internal Doors |
Every unit, every pane of glass.
Five steps from your drawings to a windows, glazing and doors number you can defend in a scope review.
An estimator reads the window and door schedules, elevations, glazing specification and the hardware schedule before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: numbers of windows and doors by type and size, square metres of glass and sets of hardware. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Houses and small extensions.
Typical fee A$350 to A$850
Apartments, retail and commercial fit-outs.
Typical fee A$850 to A$1,800
Large developments and curtain wall work.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A windows, glazing and doors takeoff from us is a per-project cost that only appears when you are actually tendering.
Schedule takeoffs for quoting.
Glass m² and framing.
Budget checks.
Per-apartment openings costs.
Specification cost feedback.
Windows and doors element cost.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Aluminium sliding window, 1200 x 1500 | No. | 24 | $ | $ | $ |
| Double glazed low-E glass | m² | 58.0 | $ | $ | $ |
| External hinged door | No. | 6 | $ | $ | $ |
| Internal fire door, FRL -/60/30 | No. | 12 | $ | $ | $ |
| Door hardware sets | No. | 48 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, we reconcile your schedule against the plans and flag differences.
Yes. BAL ratings noted on the drawings are carried into the schedule.
Yes, by m² and type.
Yes, by set.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.