ASMM / ANZSMM · Painting & Decorating · NPWC 12 WF

Painting and Decorating Estimating

Inside and outside painting measured in m² by surface, coat and system

Painting is priced by surface and system: new work versus repaint, number of coats, substrate, height and access. A single m² rate for the whole building ignores all of that.

We measure every wall, ceiling, door and trim from the plans and schedules, split each by system and coat, and return the litres, labour hours and access equipment you need.

Painter finishing an interior wall
24 to 48 hoursStandard scope turnaround
m² by surfaceWalls, ceilings, trim
By coatPrimer, undercoat, top coats
AS/NZS 2311Painting of buildings
AccessScaffold and lifts included
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Wall and ceiling areasExcel, m²By surface, level and system
Doors, windows and trimExcel, No. / mBy type, with coats
External surfacesExcel, m²Walls, fascias, eaves, roofs and fences
PreparationExcel, m²Sanding, filling and priming
Paint volumesExcel, litresBy product and coverage rate
Priced estimateExcel + PDFSupply and apply with GST shown separately
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Plastering / Tiling / Floor Covering / Painting12 WF Wall Finishes
Plastering / Tiling / Floor Covering / Painting14 CF Ceiling Finishes
Scope Coverage

Painting Work We Measure

Every surface that gets a coat.

Interior

  • Walls and ceilings
  • Doors, frames and trim
  • Cupboards and joinery
  • Feature walls

Exterior

  • Rendered and brick walls
  • Weatherboards and cladding
  • Fascias, eaves and gutters
  • Fences and decks

Specialty

  • Epoxy and floor coatings
  • Anti-graffiti coatings
  • Line marking
  • Fire-rated coatings

Preparation

  • Pressure washing
  • Sanding and filling
  • Masking and protection
  • Lead-safe procedures

Access

  • Scaffold and edge protection
  • EWPs and lifts
  • Rope access
  • Working at height allowances
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a painting number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the finishes schedule, elevations, room schedules and the painting specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of surface by substrate and coat, lineal metres of trim, and counts of doors and windows. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Single houses and units.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Offices, retail and townhouse developments.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Big commercial and multi-storey buildings.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Painting Estimating to Us

A full-time estimator is a salary, super, software seats and training. A painting takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar painting scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Painting

Painting contractors

Area and system takeoffs.

Builders

Allowances and subcontract checks.

Strata managers

Repaint scopes.

Developers

Per-unit painting costs.

Suppliers

Paint volume lists.

Property managers

Maintenance budgets.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
Internal walls, 3 coatsm²1,420.0$$$
Ceilings, 2 coatsm²620.0$$$
Doors, both sides, glossNo.42$$$
External render, 3 coatsm²380.0$$$
Scaffold hirem²380.0$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

Do you measure by coat?

Yes, each coat and system is a separate line, so new and repaint work are priced correctly.

Do you allow for preparation?

Yes, as a separate line.

Is access equipment included?

Yes: scaffold, EWPs and ladders when needed.

Can you cover repaint of strata buildings?

Yes.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Painting Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑