Interior
- Walls and ceilings
- Doors, frames and trim
- Cupboards and joinery
- Feature walls
Inside and outside painting measured in m² by surface, coat and system
Painting is priced by surface and system: new work versus repaint, number of coats, substrate, height and access. A single m² rate for the whole building ignores all of that.
We measure every wall, ceiling, door and trim from the plans and schedules, split each by system and coat, and return the litres, labour hours and access equipment you need.
| Deliverable | Format | Detail level |
|---|---|---|
| Wall and ceiling areas | Excel, m² | By surface, level and system |
| Doors, windows and trim | Excel, No. / m | By type, with coats |
| External surfaces | Excel, m² | Walls, fascias, eaves, roofs and fences |
| Preparation | Excel, m² | Sanding, filling and priming |
| Paint volumes | Excel, litres | By product and coverage rate |
| Priced estimate | Excel + PDF | Supply and apply with GST shown separately |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Plastering / Tiling / Floor Covering / Painting | 12 WF Wall Finishes |
| Plastering / Tiling / Floor Covering / Painting | 14 CF Ceiling Finishes |
Every surface that gets a coat.
Five steps from your drawings to a painting number you can defend in a scope review.
An estimator reads the finishes schedule, elevations, room schedules and the painting specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: square metres of surface by substrate and coat, lineal metres of trim, and counts of doors and windows. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Single houses and units.
Typical fee A$350 to A$850
Offices, retail and townhouse developments.
Typical fee A$850 to A$1,800
Big commercial and multi-storey buildings.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A painting takeoff from us is a per-project cost that only appears when you are actually tendering.
Area and system takeoffs.
Allowances and subcontract checks.
Repaint scopes.
Per-unit painting costs.
Paint volume lists.
Maintenance budgets.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Internal walls, 3 coats | m² | 1,420.0 | $ | $ | $ |
| Ceilings, 2 coats | m² | 620.0 | $ | $ | $ |
| Doors, both sides, gloss | No. | 42 | $ | $ | $ |
| External render, 3 coats | m² | 380.0 | $ | $ | $ |
| Scaffold hire | m² | 380.0 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, each coat and system is a separate line, so new and repaint work are priced correctly.
Yes, as a separate line.
Yes: scaffold, EWPs and ladders when needed.
Yes.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.