ASMM / ANZSMM · Groundworks · NPWC 38 EX

Groundworks & Excavation Estimating

Cut and fill, trenching and earthworks measured in m³ and m², in 24 to 48 hours

Earthworks estimates start with levels and end with truck movements. Bulking, compaction, rock, groundwater, disposal and haulage distance all change the number, and the geotechnical report often moves it more than the drawings.

We calculate cut and fill volumes from the survey and design surfaces, add the trenching, retaining and disposal scopes, and return a balanced, priced earthworks schedule.

Excavator carrying out bulk earthworks
24 to 48 hoursStandard scope turnaround
m³ cut and fillFrom design surfaces
AS 3798Earthworks standard
Geotech appliedRock and groundwater
HaulageTrucks and tip fees
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Bulk earthworksExcel, m³Cut, fill and balance with swell and shrinkage
Trimming and compactionExcel, m²Subgrade and base preparation
TrenchingExcel, m / m³By depth and service type
Rock excavationExcel, m³Where the geotechnical report shows rock
Disposal and importExcel, m³ / tCartage and tip fees, including contaminated material
Retaining and battersExcel, m / m²Walls, batters and erosion control
Priced estimateExcel + PDFPlant, labour and GST shown separately
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Groundworks / Excavation38 EX External Earthworks / Substructure
Scope Coverage

Groundworks Work We Measure

From stripping topsoil to final trim.

Bulk earthworks

  • Stripping topsoil
  • Cut and fill
  • Compaction and testing
  • Import and export

Excavation

  • Foundations and basements
  • Trenching for services
  • Rock breaking
  • Dewatering

Retaining & stabilisation

  • Retaining walls
  • Batters and benching
  • Soil nailing
  • Erosion and sediment control

Site establishment

  • Clearing and grubbing
  • Tree protection
  • Temporary access roads
  • Stockpiles

Disposal

  • Spoil removal
  • Contaminated material
  • Tip fees
  • Haulage distances
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a groundworks and earthworks number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the civil drawings, survey, geotechnical report and the earthworks specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: cubic metres of cut and fill, square metres of trimming and compaction, and lineal metres of trenching. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

House sites and small commercial.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Subdivisions and commercial sites.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Major civil and bulk earthworks.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Groundworks Estimating to Us

A full-time estimator is a salary, super, software seats and training. A groundworks and earthworks takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar groundworks and earthworks scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Earthworks

Earthmoving contractors

Volume and haulage takeoffs.

Civil contractors

Site works packages.

Builders

Excavation allowances.

Developers

Site works budgets.

Engineers

Cost feedback.

Surveyors

Quantity checks.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
Strip topsoil, 150 mmm²2,400.0$$$
Bulk cut to fillm³3,260.0$$$
Export spoil, general fillm³820.0$$$
Rock excavationm³140.0$$$
Trench excavation, 1.5 mm180.0$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

Do you apply swell and shrinkage factors?

Yes, taken from the geotechnical report if there is one, otherwise as an assumption we state.

Do you include rock?

Yes, where the report shows it.

Do you price disposal?

Yes, including tip fees and contaminated material.

Can you work from a survey?

Yes, from survey and design surfaces.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Groundworks Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑