Bulk earthworks
- Stripping topsoil
- Cut and fill
- Compaction and testing
- Import and export
Cut and fill, trenching and earthworks measured in m³ and m², in 24 to 48 hours
Earthworks estimates start with levels and end with truck movements. Bulking, compaction, rock, groundwater, disposal and haulage distance all change the number, and the geotechnical report often moves it more than the drawings.
We calculate cut and fill volumes from the survey and design surfaces, add the trenching, retaining and disposal scopes, and return a balanced, priced earthworks schedule.
| Deliverable | Format | Detail level |
|---|---|---|
| Bulk earthworks | Excel, m³ | Cut, fill and balance with swell and shrinkage |
| Trimming and compaction | Excel, m² | Subgrade and base preparation |
| Trenching | Excel, m / m³ | By depth and service type |
| Rock excavation | Excel, m³ | Where the geotechnical report shows rock |
| Disposal and import | Excel, m³ / t | Cartage and tip fees, including contaminated material |
| Retaining and batters | Excel, m / m² | Walls, batters and erosion control |
| Priced estimate | Excel + PDF | Plant, labour and GST shown separately |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Groundworks / Excavation | 38 EX External Earthworks / Substructure |
From stripping topsoil to final trim.
Five steps from your drawings to a groundworks and earthworks number you can defend in a scope review.
An estimator reads the civil drawings, survey, geotechnical report and the earthworks specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: cubic metres of cut and fill, square metres of trimming and compaction, and lineal metres of trenching. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
House sites and small commercial.
Typical fee A$350 to A$850
Subdivisions and commercial sites.
Typical fee A$850 to A$1,800
Major civil and bulk earthworks.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A groundworks and earthworks takeoff from us is a per-project cost that only appears when you are actually tendering.
Volume and haulage takeoffs.
Site works packages.
Excavation allowances.
Site works budgets.
Cost feedback.
Quantity checks.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Strip topsoil, 150 mm | m² | 2,400.0 | $ | $ | $ |
| Bulk cut to fill | m³ | 3,260.0 | $ | $ | $ |
| Export spoil, general fill | m³ | 820.0 | $ | $ | $ |
| Rock excavation | m³ | 140.0 | $ | $ | $ |
| Trench excavation, 1.5 m | m | 180.0 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, taken from the geotechnical report if there is one, otherwise as an assumption we state.
Yes, where the report shows it.
Yes, including tip fees and contaminated material.
Yes, from survey and design surfaces.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.