Structured cabling
- Cat 6 and Cat 6A cable
- Fibre backbone
- Patch panels and leads
- Outlets and faceplates
Data cabling, outlets, racks and low-voltage systems, measured in metres and numbers
Data and communications scopes are full of small, repeated items: outlets, patch leads, terminations, tests. Counted wrong, they either blow the budget or leave you short on site.
We count every outlet, measure cable and containment, and schedule the racks and testing, giving a clean, auditable communications estimate.
| Deliverable | Format | Detail level |
|---|---|---|
| Data outlets | Excel, No. | By category and location |
| Cabling | Excel, m | Cat 6, Cat 6A and fibre |
| Racks and patch panels | Excel, No. | By size and port count |
| Containment | Excel, m | Tray, conduit and trunking |
| Terminations and testing | Excel, No. | Per cable and certified |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Data, Comm & Intercom Installations | 25 CM Communications Services |
Every outlet and every rack.
Five steps from your drawings to a data and communications number you can defend in a scope review.
An estimator reads the communications drawings, rack layouts and the data and communications specification before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: lineal metres of cable by category, counts of outlets, patch panels and racks, and numbers of terminations. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small offices and shops.
Typical fee A$350 to A$850
Commercial offices and clinics.
Typical fee A$850 to A$1,800
Data centres and campuses.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A data and communications takeoff from us is a per-project cost that only appears when you are actually tendering.
Outlet and cable takeoffs.
Low-voltage packages.
Allowances.
Cost feedback.
Cable and rack lists.
Per-unit communications costs.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Cat 6A data outlets | No. | 120 | $ | $ | $ |
| Cat 6A cable | m | 9,600 | $ | $ | $ |
| Patch panels, 48 port | No. | 4 | $ | $ | $ |
| Data racks, 42 RU | No. | 2 | $ | $ | $ |
| Cable certification | No. | 120 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Yes, backbone and horizontal.
Yes.
Yes, certification per cable.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.